Carnegie Mellon University
Browse
- No file added yet -

Optimal production planning under time-sensitive electricity prices for continuous power-intensive processes

Download (723.99 kB)
journal contribution
posted on 2011-07-01, 00:00 authored by Sumit Mitra, Ignacio E. Grossmann, Jose M. Pinto, Nikhil Arora

Power-intensive processes can lower operating expenses when adjusting production planning according to time-dependent electricity pricing schemes. In this paper, we describe a discrete-time, deterministic MILP model that allows optimal production planning for continuous power-intensive processes. We emphasize the systematic modeling of operational transitions, that result from switching the operating modes of the plant equipment, with logic constraints. We prove properties on the tightness of several logic constraints. For the time horizon of 1 week and hourly changing electricity prices, we solve an industrial case study on air separation plants, where transitional modes help us capture ramping behavior. We also solve problem instances on cement plants where we show that the appropriate choice of operating modes allows us to obtain practical schedules, while limiting the number of changeovers. Despite the large size of the MILPs, the required solution times are small due to the explicit modeling of transitions.

History

Publisher Statement

This is the author’s version of a work that was accepted for publication. Changes resulting from the publishing process, such as peer review, editing, corrections, structural formatting, and other quality control mechanisms may not be reflected in this document. Changes may have been made to this work since it was submitted for publication. A definitive version is available at http://dx.doi.org/10.1016/j.compchemeng.2011.09.019

Date

2011-07-01

Usage metrics

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC