Carnegie Mellon University
Browse
file.pdf (235.59 kB)

CMM-Based Process Improvement and Schedule Deviation in Software Maintenance

Download (235.59 kB)
report
posted on 2003-07-01, 00:00 authored by Ho-Wan Jung, Dennis Goldenson
The objective of this study is to evaluate the predictive validity of the Capability Maturity Model (CMM) for Software (SW-CMM) as applied to software maintenance. The SW-CMM is intended to apply to both software development and maintenance. A basic premise (hypothesis) of the SW-CMM is that improving process maturity will result in better project performance and product quality. The extent to which that hypothesis is supported empirically is called a test of its predictive validity. No previous evaluation exists of the predictive validity of the SW-CMM in a maintenance context. The extent to which schedule estimates differ from reality is one important measure of project performance. But is higher maturity in fact correlated with a reduction in schedule deviation? Data from 752 maintenance projects drawn from 441 SW-CMM assessments are analyzed using a zero inflated Poisson (ZIP) regression model, and the results are validated using a bootstrap estimation method. Projects from higher maturity organizations typically report less schedule deviation than those from organizations assessed at lower maturity levels.

History

Date

2003-07-01

Usage metrics

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC